LISTA TESTHUB · FARSUND · NORWAYFarsund Airport ↗
Quick access
TESTING / CAPABILITIES

A setting for
practical development.

Test opportunities are agreed project by project, based on technical needs, operational limitations and required permits.

Technical activity inside a hangar
THE FACILITIES

Space for preparation,
test and iteration.

Large airfield surfaces, hangars and support facilities make it possible to discuss a range of on-site arrangements, from equipment preparation to repeat testing.

Runway or controlled-airspace use requires separate operational and authority arrangements. Safety plans and project access must be assessed before activity.

Discuss your project↗
HOW A PROJECT STARTS

From question
to fieldwork.

A practical first-contact process. No bookings or permissions are implied by contacting us.

01

Describe the need

System, objectives, dates and desired conditions.

02

Review the site

Discuss suitability and availability.

03

Agree requirements

Safety, permissions, responsibilities and terms.

04

Plan the trial

Set up a scoped project plan.